Our work
More than 1,399 projects delivered across Oman.
A look at our teams on site: testing switchgear, studying power systems, surveying land and installing equipment.
TestingSwitchgear testing & commissioningMay 2017
TestingProtection relay testingRelay test · passed
TestingPanel testing on siteJanuary 2017
DesignPower system studies (ETAP)Load flow, short circuit & protection
SurveyGPS land surveyPeg-marking & drawings
ElectricalControl panel commissioningApril 2016
ContractingSite works & installationApril 2016
ElectricalSwitchgear line-upJune 2017
DesignSingle-line diagram & system modelPower system design
TestingRelay test set on siteJanuary 2017
TestingRelay test & settings verificationFebruary 2017
SurveySurvey team & equipmentLand survey
TestingTest set measurementsFebruary 2016
TestingProtection characteristic checkMarch 2017
TestingTesting at the panelMarch 2016
1,399+Projects completed
53+Happy clients
34+Team members
10Awards won
2010Established
Have a project in mind?
Tell us about it. We'll reply within one working day.